[1]
Rumambi, R., Sandhyavitri, A., Ikhsan, M. and Fauzi, M. 2024. Mitigasi Risiko Keterlambatan Proyek Sumur Injeksi Migas X dengan Penerapan Schedule Risk Analysis. SAINSTEK. 12, 1 (Jun. 2024), 34–40. DOI:https://doi.org/10.35583/js.v12i1.203.