“Mitigasi Risiko Keterlambatan Proyek Sumur Injeksi Migas X Dengan Penerapan Schedule Risk Analysis”. 2024. SAINSTEK 12 (1): 34-40. https://doi.org/10.35583/js.v12i1.203.