Rumambi, Ridho, Ari Sandhyavitri, Muhammad Ikhsan, and Manyuk Fauzi. 2024. “Mitigasi Risiko Keterlambatan Proyek Sumur Injeksi Migas X Dengan Penerapan Schedule Risk Analysis”. SAINSTEK 12 (1):34-40. https://doi.org/10.35583/js.v12i1.203.